Cedars-Sinai Advanced Health Sciences Pavilion Bridge Erection Posted on November 20, 2013 by admin Hathaway Dinwiddie, the buildings general contractor, developed this interesting video to document the erection of the 5th floor pedestrian bridge. The 170’ long bridge was put in place over a two day period. SHARE: